COOLING
CONVEYOR |
AFTER THE FRYING PROCESS, IT IS VERY IMPORTANT THAT THE EXTRA HEATED OIL IS REMOVED. THE DE-OILING CONVEYOR ALSO SERVES THE PURPOSE OF AN “INSPECTION CONVEYOR”
AFTER DE-OILING, IT IS OF UTMOST IMPORTANCE THAT THE MATERIAL IS COOLED TO AVOID EXCESS COOKING / OVER HEATING. THE “COOLING-CONVEYOR” IS FITTED WITH SUITABLE BLOWER & DUCT SYSTEM TO CREATE A “WIND-TUNNEL” EFFECT & BRING DOWN THE TEMPERATURE TO CONDITIONS SUITABLE FOR PACKING.
|
|